MOOG D662-1923E-4 ServoJet Two-Stage Integrated Servo Valve
Description
2. Hydraulic Technical Data
Rated Flow: 240 L/min (ΔP=35bar per land); Max overflow ≈290 L/min
Working Pressure:
P/A/B main ports: Max 350 bar (5000PSI)
External Y drain port: Max 350bar; Internal drain option limited to 210bar
Pilot configuration: External X control oil supply, external Y drain, needs independent pilot oil pipeline layout
Working medium: DIN51524 mineral hydraulic oil, oil cleanliness NAS 6~7; Operating temp: -20℃~+70℃
Net weight: ≈7.2kg
Fail-safe feature: Power loss → mechanical spring resets spool to mid-position, lock actuator position
3. Electrical Parameters
Power supply: DC24V(18~32VDC), power consumption ≤42WMoog Inc.
Control input: Standard differential ±10VDC; optional ±10mA current signalMoog Inc.
Full stroke step response (210bar supply, 0→100%): 12~16ms
Connector: 11-pin circular aviation plug; built-in reverse polarity, overcurrent & short-circuit protection, EMC EN61000 compliantMoog Inc.
Protection grade: Plug IP65, valve body IP54
4. Core Structure Features
ServoJet jet-pipe pilot: Superior anti-pollution, low zero drift, long-term stable operation compared with nozzle-flapper pilot
Built-in non-contact LVDT spool displacement closed-loop inside valve body, linearity ≤±0.25%FS
Side-mounted adjustable zero potentiometer for field zero calibration without valve disassembly
ISO4401-07 standard mounting interface, matched NG16 integrated manifold
5. Typical Application
Large tonnage hydraulic forming press, metal extrusion hydraulic control system
Automobile chassis/vehicle body large component fatigue durability test bench
Metallurgical rolling mill hydraulic AGC thickness control system
Large-scale hydraulic test rig for aerospace hydraulic actuator performance test
6. Installation & Maintenance Tips
Mount on ISO4401-07 standard manifold; separate external X/Y pilot oil pipeline independently
Install ≥3μm high-pressure filter at main P inlet and X pilot oil inlet to prevent pilot jet clogging
Shielded control wiring separated from high-power power cable to avoid electromagnetic interference
Annual full zero calibration, half-year seal inspection and leakage check
Get a Quote