170MCI04110
Description
1. General Description
2. Product Identification
Model Number: 170MCI04110 (also referenced as 170‑MCI‑041‑10)
Manufacturer: Schneider Electric (Modicon)
Product Line: Modicon Momentum
Protocol: Modbus Plus (MB+) / RS485 (master)
Application: Master‑slave, short‑haul interconnection, compact rack clusters
Length: 0.3 m (0.98 ft / 1 ft)
Connectors: 2 × male shielded RJ45 (MB+ master pinout)
Cable Type: Shielded twisted pair (RS485 differential signaling)
Weight: Approximately 0.06 kg (0.13 lb)
Warranty: 2 years
Country of Origin: France
Status: Active (as of 2026)
3. Electrical and Mechanical Specifications
Interface: RJ45 (shielded, MB+ master pinout)
Wiring: Factory‑prewired; no user wiring required
Shielding: 100% foil + braid shield (EMI/RFI immunity)
Conductors: 2 twisted pairs (RS485 differential signaling)
Insulation: Industrial PVC (gray)
Minimum Bend Radius: ≥ 8 × cable diameter
Operating Temperature: 0 °C to +60 °C
Storage Temperature: -40 °C to +85 °C
Humidity: 5% to 80% (non‑condensing)
Altitude: Up to 1,000 m above sea level (no derating)
Protection Class: IP20
Certifications: CE, RoHS, UL, cUL, CSA
4. Compatibility
Platforms: Modicon Momentum (170 series), Premium, Quantum
Devices: MB+ master communication adapters (e.g., 170MCIxxx), Momentum I/O bases with integrated MB+ master ports
Network Topologies: MB+ master‑slave, short trunk/drop, compact rack cluster‑mode
Software: Unity Pro, MB+ Network Configurator
5. Key Features
Plug‑and‑play: Pre‑tested factory assembly for immediate use
0.3 m Length: Optimized for tight, space‑saving installations
Shielded RJ45 Connectors: Industrial‑grade noise immunity
Master‑Mode Ready: Designed for MB+ master port interconnections
Hot‑Swap Compatible: Module replacement without network shutdown
1 Mbps MB+ Support: Full deterministic communication speed
6. Applications
Short‑link MB+ master‑slave connections in Momentum racks
Compact panel and machine‑mounted I/O interconnections
Cluster‑mode master communication in limited‑space cabinets
High‑speed distributed I/O in material handling and packaging
Factory floor automation with tight layout constraints
7. Installation Instructions
Power Off: Disable power to all connected modules before installation.
Align Connectors: Match the male RJ45 key with the MB+ master port on the first module.
Insert Firmly: Push until the latch clicks, confirming secure shield contact.
Connect Second End: Repeat for the MB+ port on the second module.
Verify Connection: Ensure both connectors are fully seated and locked.
Power On: Restore power and verify MB+ network status via PLC software.
8. Maintenance
Quarterly Inspection: Check RJ45 connectors for wear, dirt, or bent pins.
Cable Care: Avoid heavy stress, sharp bends, or crushing.
Shield Integrity: Verify continuity; follow MB+ grounding rules (avoid both‑end grounding).
Replacement: Replace if insulation is damaged or connectors show corrosion.
9. Safety Precautions
Qualified Personnel: Installation and service by qualified technical staff only.
Power Disconnection: Always disconnect power before connecting/disconnecting.
Indoor Use Only: For indoor industrial environments; avoid sunlight and moisture.
Damage Check: Do not use if insulation or connectors are damaged.
Disposal: Dispose per local electronic waste regulations.
10. Troubleshooting
No MB+ Communication
Confirm both RJ45 latches are fully engaged.
Verify MB+ network power and termination (120 Ω at trunk ends).
Check unique MB+ addresses and correct master/slave configuration.
Intermittent Communication
Inspect for loose latches or bent pins.
Check for excessive vibration or cable movement.
Ensure proper shield connection at both ends.
Get a Quote