ABB PU513 (PU513V2, 3BSE013034R1) real‑time accelerator (RTA) board
Description
Product Introduction
Model Interpretation
PU: Processor/Accelerator Unit
513: Model series (higher performance than PU512)
V2: Hardware revision
3BSE013034R1: ABB part number for ordering and traceability.
Technical Parameters
Processor: 32‑bit RISC, 133 MHz (faster than PU512)
Memory: 32 MB RAM, 32 MB Flash (double PU512)
Power Supply: 24 V DC ±20%; 80 mA typical current consumption
Operating Temperature: −20 °C to +60 °C
Storage Temperature: −40 °C to +85 °C
Humidity: 10%–95% RH, non‑condensing
Protection: IP20 (board‑level)
Dimensions: 25 mm × 127 mm × 356 mm
Weight: ~0.45 kg
Form Factor: EISA/PCI add‑on board for industrial workstations
Interface & Communication
Onboard I/O: 16‑channel digital I/O + 8‑channel analog I/O (expandable)
Communication: RS‑232/485, 10/100 Mbps Ethernet; supports Modbus TCP/IP, Profibus, and Advant OCS protocols
Expansion: EISA/PCI bus interface for host connection; compatible with PU500 series racks
Core Functions
Real‑Time Acceleration: Offloads complex calculations, fast loop control, and data processing from the main CPU
Enhanced Determinism: Lower latency and tighter synchronization for critical process loops (better than PU512)
High‑Speed I/O Handling: Dedicated processing for digital/analog I/O with optical isolation
System Optimization: Improves throughput and stability in high‑demand DCS environments
Application Scenarios
Power Generation: Turbine control, generator protection, and grid monitoring (Advant 500 series power plants)
Process Industries: Chemical, oil & gas, pulp & paper, and water treatment (high‑speed DCS control)
Industrial Automation: High‑precision motion control, fast batch processes, and real‑time data acquisition
Legacy System Upgrades: Replacement/upgrade for PU512 in Advant OCS/MOD 300 systems
Operation & Maintenance
Installation: Insert into EISA/PCI slot of compatible industrial workstation; secure with mounting screws
Wiring: Use shielded cables for I/O and communication; separate power and signal lines
Configuration: Set up via Advant OCS engineering tools; assign real‑time tasks to the RTA
Maintenance: Inspect connection integrity periodically; no user‑serviceable components—replace the board if faulty
Storage: Keep dry and temperature‑controlled when not in use
Get a Quote