HONEYWELL 51305072-200
Description
Product Description
Model Definition
51305072-200: Honeywell part number for CLCN‑A (A‑network).
5130: Honeywell DCS hardware series.
5072: CLCN series circuit design code.
200: Designates LCN A‑network variant (distinct from 300/400/800).
Alias: CLCN‑A paddle board, LCN A‑network communication board, TDC3000 controller network card.
Technical Specifications
System Compatibility: Honeywell TDC 3000, TPS, Experion PKS (C300).
Power Supply: 24 VDC from controller backplane.
Operating Temperature: -40 °C to +70 °C.
Storage Temperature: -40 °C to +85 °C.
Humidity: 5%–95% non‑condensing.
Dimensions: Approx. 180 mm × 70 mm × 40 mm.
Weight: Approx. 0.2 kg.
Data Rate: 1 Mbps.
Max Nodes: 255 per network segment.
Certifications: CE, UL, CSA, RoHS.
Interface and Communication Configuration
LCN‑A Port: BNC coaxial connector for LCN A‑backbone.
Controller Interface: Gold‑finger edge connector for dedicated CB120/CB121 slot.
Isolation: Full electrical isolation between controller and LCN to suppress common‑mode noise.
Indicators: Power, Link, Fault LEDs for real‑time status.
Protocol: Honeywell proprietary LCN; supports remote diagnostics via engineer station.
Core Functions
A‑Network Connectivity: Dedicated LCN A‑network access for controllers in redundant pairs.
Signal Adaptation: Converts between controller single‑ended and LCN differential signaling.
Electrical Isolation: Contains faults to prevent network‑wide propagation.
Impedance Matching: Optimizes coaxial transmission, reduces reflection/attenuation.
Redundancy Support: Pairs with CLCN‑B for dual‑network failover and high availability.
Application Scenarios
Controller Redundancy: TDC3000/TPS with CB120/CB121 and dual LCN A/B networks.
Process Industries: Oil/gas, chemical, power, petrochemical, pharmaceutical plants.
Control Rooms: Standard industrial temp/humidity in control cabinets.
System Upgrades: Replacement for older KLCN‑A boards; fits existing LCN infrastructure.
Usage and Maintenance Instructions
Usage
Installation: Insert firmly into controller’s CLCN‑A slot; tighten screws to resist vibration.
Wiring: Connect LCN A coaxial cable to BNC; ensure clean, tight connection.
Power‑on: Energize controller; verify steady Power/Link LEDs, no Fault.
Configuration: Set LCN A address and redundancy via DCS engineer station.
Maintenance
Environment: Keep clean, dry, ventilated; maintain rated temp/humidity.
Inspection: Check LEDs monthly; inspect BNC tightness/cleanliness quarterly.
Cleaning: Wipe dust with dry soft cloth; no liquid cleaners.
Storage: Store spares in anti‑static packaging, cool/dry, away from ESD/magnetic fields.
Service: Do not disassemble; all work by qualified personnel.
Get a Quote