51305072300
May 22, 2026

51305072300

The 51305072‑300 (CLCN‑B) is an LCN I/O Paddle Board for Honeywell TDC3000/TPS DCS systems. It installs in 5‑slot/10‑slot I/O chassis, providing CLCN‑B (Control LCN‑B) interface, node address configuration, and LCN communication for system control network connectivity.

Description

Product Overview

The 51305072‑300 (CLCN‑B) is an LCN I/O Paddle Board for Honeywell TDC3000/TPS DCS systems. It installs in 5‑slot/10‑slot I/O chassis, providing CLCN‑B (Control LCN‑B) interface, node address configuration, and LCN communication for system control network connectivity.

Basic Information

  • Part Number: 51305072300 (51305072‑300)

  • Module Type: CLCN‑B I/O Paddle Board

  • Compatible System: Honeywell TDC3000 / TPS

  • Manufacturer: Honeywell

  • Country of Origin: USA

  • Weight: Approx. 0.16 kg (0.35 lb)

  • Certification: CE, UL

  • Status: Discontinued by manufacturer

Technical Specifications

  • Network Interface: CLCN‑B (single LCN port, non‑redundant)

  • Node Address: Configurable via on‑board jumpers

  • Power Supply: Powered by chassis backplane

  • Operating Temperature: ‑10°C to +55°C

  • Storage Temperature: ‑20°C to +70°C

  • Humidity: 5%–95% RH, non‑condensing

  • Mounting: Dedicated slot for standard 5/10‑slot chassis

Key Features

  1. CLCN‑B Interface: Dedicated port for Control LCN‑B network communication.

  2. Jumper‑Configured Node ID: On‑board jumpers set unique LCN node address.

  3. Chassis Bus Bridging: Transfers data between chassis I/O cards and LCN.

  4. Compact Design: Optimized for TDC3000 5/10‑slot chassis installation.

  5. Status Indication: Supports system diagnostic reporting for link health.

Application Scope

  • Industries: Power, chemical, oil & gas, pulp & paper, metallurgy.

  • System Role: CLCN‑B communication interface for TDC3000/TPS I/O chassis.

  • Use Case: Installed in 5/10‑slot chassis to enable LCN connectivity and node addressing (non‑redundant B‑only version).

Installation & Wiring

  1. Power Off: De‑energize chassis before insertion/removal.

  2. Chassis Installation: Insert into dedicated slot and secure.

  3. CLCN‑B Connection: Connect LCN‑B cable to the CLCN‑B port.

  4. Address Setting: Configure on‑board jumpers for unique node ID.

  5. ESD Protection: Wear anti‑static wristbands during handling.

Maintenance Requirements

  • Periodic Inspection: Check cable connections and jumper settings for looseness/corrosion.

  • Cleaning: Wipe dust with dry soft cloth; avoid liquid cleaners.

  • Replacement: Use original Honeywell parts; do not disassemble.

  • Fault Handling: Verify CLCN‑B cable and jumper settings if communication fails.

Safety Notice

  • All wiring/maintenance must be performed with power disconnected.

  • Do not exceed rated temperature/humidity limits.

  • Unauthorized modification/disassembly is prohibited.

  • Comply with site safety rules and ESD procedures.


Get a Quote